View Issue Details

IDProjectCategoryView StatusLast Update
0002024T99X171.00 SKB EagleGeneralpublic2025-07-07 10:01
Reporter(ALTech) SH Son Assigned To(MFG) Rachel Ruan Due Date
PrioritynormalSeveritys4-minorReproducibilityhave not tried
Status feedbackResolutionreopened 
Summary0002024: [EAGLE] 2024.12 Mass production inspection Report
Description[EAGLE] 2024.12 Mass production inspection Report
TagsNo tags attached.
Attach Tags

Relationships

related to 0001662 new [Eagle] Mass production inspection Report  
related to 0002023 closed(PM) Roisy Liang [Eagle] 2024.12 Monthly RMA_KR (Lot 22) shipping list  

Activities

(ALTech) SH Son

2025-01-09 14:27

developer   ~0017244

HI An and Rachel

Here is inspection report of this month.
 Critical
• Ethernet fail * 1pcs

Please find the attachment file, and defect sample will be shipped with monthly RMA 0002023:0017242

Thanks
SON

(MFG) Rachel Ruan

2025-01-14 16:58

developer   ~0017257

Dear SH Son

Here is the FA report about DOA Ethernet fail on Inspection 12.2024.

Summary:
- This unit has PASSED normally SMT and FATP.- Shipping date: 2024/11/18
- The SPI & Pre-AOI and Post-AOI history not found issue
- Ethernet fail can cover 100% at FATP
 Action:
- Fii need to get NG board on hand to analysis to find out root cause. Therefore, may can we suggest that ALT send Defective samples back to Vietnam for us to analyze further.

Many thanks
Rachel

(ALTech) SH Son

2025-03-27 15:31

developer   ~0017386

Hi Rachel.

Please update this request


Thanks
SON

(MFG) Rachel Ruan

2025-04-03 21:26

developer   ~0017399

Dear Mr Son

Since our planning side received 2 lots of RMA ( 169 pcs + 100 pcs ) and analysis together,
we just received the DOA Ethernet you noticed " 2149688001202404449199 ". we are analyzing , we will update FA report as soon as possible.

Many Thanks
Rachel

(ALTech) SH Son

2025-04-04 11:16

developer   ~0017403

HI Rachel

Agree. please let me know the due date when you start the failure analysis

Thanks
SON

(MFG) Rachel Ruan

2025-04-11 21:19

developer   ~0017466

Dear Mr Son

ALT customer defecting 1 pcs DOA in 2024.12 Mass production inspection (This SN shipment in November 2024).
05/ April / 2025, the defective DOA arrived in Vietnam for analysis.
Fii Confirmed the actual fail when Fii re-test at the factory is the same as the customer's feedback.

NG broad DOA can not internet access and this issue can not be covered at FATP because the online product does not test the Internet network category. Only OBA tests Internet access and You tobe . (OBA according to AQL 0.65).

Because this is the first product with the internet access problem, we are still monitoring the production line. Waiting for RD's opinion so we can send U1 to vendor for further analysis.

Fii Action :
1. Co-work with RD/TE how to cover this issue. Owner: PE: Justin, PQE: Rachel. Due date: 25/04/25
2. Send NG component to AMLOGIC vendor further FA. Owner: PE: Justin, SQE: Mia. Due date: 25/05/20

Many Thanks
Rachel

(ALTech) SH Son

2025-07-07 10:01

developer   ~0017605

HI Rachel.
Please update your action items.

1. Co-work with RD/TE how to cover this issue. Owner: PE: Justin, PQE: Rachel. Due date: 25/04/25
2. Send NG component to AMLOGIC vendor further FA. Owner: PE: Justin, SQE: Mia. Due date: 25/05/20

Add Note

View Status
Note
Upload Files
Maximum size: 800,000 KB

Attach files by dragging & dropping, selecting or pasting them.

Issue History

Date Modified Username Field Change
2025-01-09 14:20 (ALTech) SH Son New Issue
2025-01-09 14:20 (ALTech) SH Son Relationship added related to 0001662
2025-01-09 14:21 (ALTech) SH Son Relationship added related to 0002023
2025-01-09 14:27 (ALTech) SH Son Note Added: 0017244
2025-01-09 14:27 (ALTech) SH Son File Added: [EAGLE] 2024.12_Mass production inspection_rev01.pdf
2025-01-09 14:27 (ALTech) SH Son Assigned To => (MFG) Rachel Ruan
2025-01-09 14:27 (ALTech) SH Son Status new => assigned
2025-01-14 16:58 (MFG) Rachel Ruan Note Added: 0017257
2025-01-14 16:58 (MFG) Rachel Ruan File Added: BFX AT-100 Ethernet fail FA report.pptx
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (ALTech) Hyunsik Kim
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (ALTech) Sophie Lee
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (MFG) An Tran
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (MFG) Rachel Ruan
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (MFG) Toney Tu
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (PM) Sheila Tu
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2025-03-27 15:29 (ALTech) SH Son Issue Monitored: (Sales) Miya Wang
2025-03-27 15:31 (ALTech) SH Son Note Added: 0017386
2025-04-03 21:26 (MFG) Rachel Ruan Note Added: 0017399
2025-04-04 11:16 (ALTech) SH Son Note Added: 0017403
2025-04-07 09:23 (SW) Willin Deng Severity s2-severe => s4-minor
2025-04-11 21:19 (MFG) Rachel Ruan Note Added: 0017466
2025-04-11 21:19 (MFG) Rachel Ruan File Added: BFX AT-100 DOA Ethernet fail FA report 20250411.pptx
2025-07-04 16:58 (PM) Sheila Tu Status assigned => closed
2025-07-04 16:58 (PM) Sheila Tu Resolution open => fixed
2025-07-07 10:01 (ALTech) SH Son Status closed => feedback
2025-07-07 10:01 (ALTech) SH Son Resolution fixed => reopened
2025-07-07 10:01 (ALTech) SH Son Note Added: 0017605